Lindau, Ludwig-Kick-Street / Kemptener Street

An excavation pit created for the new "MYOS" high-rise building is enclosed by a mixed-in-place wall. BAUER Resources GmbH provided thermal activation of the component, allowing heat exchange with the subsoil.
BAUER Resources GmbH – Thermally activated excavation pit enclosure
Service Provider

BAUER Resources GmbH

BAUER-Straße 1 / 86529 Schrobenhausen
Description

The construction of the geothermal plant included, among other things:

  • 68 steel beams provided by the client covered with pipes PE 100-RC, DA 32, SDR 11
  • per occupied support: merging of the pipes in the connection box (a total of 68 merging points)
  • For each carrier used: one pressure test (a total of 68 pressure tests)
  • Installation of PE 100-RC, DA 25, SDR 11 pipes for thermal activation of the floor slab. Thermally activated area: 1,936 m².
  • Delivery and installation of a floor slab penetration for 23 pipe circuits and connection of the pipes to the floor slab penetration
  • Carrying out 23 pressure tests (one pressure test per pipe circuit)
  • Delivery of a distribution unit for 23 pipe circuits, connection of the pipes (floor plate penetration) to the distribution unit.
  • Filling the system with 3.5 m³ of heat transfer medium (water-glycol mixture)
  • Hydraulic calculation
  • Thermal response test
  • Numerical FEM simulation calculation
Horizontal pipe connection
Properties of the pipelines: PE 100-RC, DA 32
Thermal activation
Ø Pipelines (Thermal Activation): DA 25, DA 32
Planning services
Plant design: Numerical FEM simulation calculation
General Project Properties
Material of the pipes: PE 100-RC
Welding processes: Electrofusion welding
Client

BAUER Spezialtiefbau GmbH

BAUER-Straße 1
86529 Schrobenhausen
Bavaria, Germany, Europe