The construction of the geothermal plant included, among other things:
- 68 steel beams provided by the client covered with pipes PE 100-RC, DA 32, SDR 11
- per occupied support: merging of the pipes in the connection box (a total of 68 merging points)
- For each carrier used: one pressure test (a total of 68 pressure tests)
- Installation of PE 100-RC, DA 25, SDR 11 pipes for thermal activation of the floor slab. Thermally activated area: 1,936 m².
- Delivery and installation of a floor slab penetration for 23 pipe circuits and connection of the pipes to the floor slab penetration
- Carrying out 23 pressure tests (one pressure test per pipe circuit)
- Delivery of a distribution unit for 23 pipe circuits, connection of the pipes (floor plate penetration) to the distribution unit.
- Filling the system with 3.5 m³ of heat transfer medium (water-glycol mixture)
- Hydraulic calculation
- Thermal response test
- Numerical FEM simulation calculation